Rollestone Camp – New Diner Facility

LOCATION:

Salisbury Plain, Wiltshire
A £7m design and build project delivered for Landmarc Support Services, providing a modern, fully operational kitchen and dining facility. The development enhances catering capacity, operational efficiency and environmental performance for military personnel within a secure defence environment.
Rollestone Camp – New Diner Facility

What did we do?

Key features of the development included:

  • Construction of a replacement kitchen and dining facility.
  • Full delivery of substructure and superstructure works, including:
    • Foundations and below-ground drainage
    • Steel frame construction
    • Roofing, cladding and glazing systems
  • Installation of doors, internal partitions and ceilings.
  • Delivery of full mechanical and electrical (M&E) systems.
  • Specialist commercial kitchen fit-out, including catering equipment and hygienic finishes.
  • Internal works including:
    • Joinery, flooring and decorative finishes
    • Hygienic wall cladding and sanitary installations
  • Extensive external works and infrastructure integration.

Sustainability & Operational Value

  • Use of energy-efficient systems to reduce operational carbon impact.
  • High-performance building envelope improving thermal efficiency.
  • Durable, low-maintenance materials suited to intensive operational use.
  • Efficient M&E systems supporting long-term cost savings.
  • Contribution to improved living and working conditions for defence personnel.

Challenges

The project required delivery within a live and secure military environment:

  • Always maintaining strict security protocols and controlled access.
  • Coordinating construction activities within an operational defence site.
  • Delivering a highly serviced building with complex M&E and catering installations.
  • Ensuring minimal disruption to day-to-day military operations.
  • Achieving high standards of durability, hygiene and performance required for defence catering facilities.

Name Surname
Job role on project

Solution

A collaborative and carefully phased approach ensured successful delivery:

  • Detailed planning and stakeholder coordination with defence personnel and site operators.
  • Implementation of a phased construction strategy to maintain operational continuity.
  • Integration of specialist contractors to deliver high-spec commercial kitchen installations.
  • Use of robust construction materials and systems to meet long-term operational demands.
  • Close management of logistics and site access to comply with security and safety requirements.

Outcome

The project delivered:

  • A modern, efficient kitchen and dining facility for military personnel.
  • Enhanced catering capacity and operational resilience.
  • Improved user experience through high-quality, functional and comfortable spaces.
  • A durable and future-proof facility designed for long-term defence use.
  • Successful delivery aligned with programme and operational requirements.